Difference between revisions of "Retrospective plan template"

From Agile Retrospective Resource Wiki
Jump to navigation Jump to search
(Created page with "Please use the following structure when adding a retrospective plan: ===Use:=== The context in which your plan is appropriate (e.g. "when the team is not communicating well") ...")
 
Line 1: Line 1:
 +
__NOTOC__
 
Please use the following structure when adding a retrospective plan:
 
Please use the following structure when adding a retrospective plan:
 
===Use:===
 
===Use:===

Revision as of 08:35, 25 February 2013

Please use the following structure when adding a retrospective plan:

Use:

The context in which your plan is appropriate (e.g. "when the team is not communicating well")

Length of time:

Approximate duration of the exercise.

Short Description:

A brief summary of the process and output.

Materials:

Any materials required e.g. flip charts, post-it notes etc.

Process:

A detailed and instructive guide on how to run the retrospective. Try to be use bullets and ordered lists rather than long paragraphs.

Source:

Credit to the retrospective plan author which could include a link to the original or creator's website.