Difference between revisions of "Retrospective plan template"

From Agile Retrospective Resource Wiki
Jump to navigation Jump to search
(Undo revision 967 by Ledalla Madhavi (talk))
Line 10: Line 10:
  
 
===Short Description:===
 
===Short Description:===
Instructions: As a facilitator, draw a large picture of a mountain hiking scene as shown at the reverse of the card, with helmets, ropes, slippery slopes, rain and thunder. This would enable the teams to visualize the analogy. Explain that we're going to use mountain hiking as a visual metaphor for the retrospective. The facilitator then asks the team to think of the impediments and risks that are impeding the team from reaching their sprint goal, and what are the driving forces that help the team move forward. Let the team brainstorm and think of one item each for the three categories. Use three different colours for the different categories for better visualization. Discuss the data points and come up with SMART goals.
+
A brief summary of the process and output.
 
 
 
===Materials:===
 
===Materials:===
 
Any materials required e.g. flip charts, post-it notes etc.
 
Any materials required e.g. flip charts, post-it notes etc.

Revision as of 05:21, 5 January 2018

Contribute

You will have to create an account to add a retrospective plan, which will have to be approved by the administrator (@robbowley). Sorry for the bureaucracy but the wiki gets hammered by spam bots!

Please use the following structure when adding a retrospective plan:

Use:

Length of time:

60 min

Short Description:

A brief summary of the process and output.

Materials:

Any materials required e.g. flip charts, post-it notes etc.

Process:

A detailed and instructive guide on how to run the retrospective. Try to be use bullets and ordered lists rather than long paragraphs.

Source: