Strengths-Based Retrospective

From Agile Retrospective Resource Wiki
Revision as of 06:51, 10 September 2014 by Ben Linders (talk | contribs) (Created page with "Use: The context in which your plan is appropriate (e.g. "when the team is not communicating well") [edit]Length of time: Approximate duration of the exercise. [edit]Short Des...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Use: The context in which your plan is appropriate (e.g. "when the team is not communicating well") [edit]Length of time: Approximate duration of the exercise. [edit]Short Description: A brief summary of the process and output. [edit]Materials: Any materials required e.g. flip charts, post-it notes etc. [edit]Process: A detailed and instructive guide on how to run the retrospective. Try to be use bullets and ordered lists rather than long paragraphs. [edit]Source: Credit to the retrospective plan author which could include a link to the original or creator's website.